Request For Qualifications 2024-012
General Contractor/Construction Manager Services for CKTP Solids and Liquids Hauled Waste Upgrades Project
- Central Kitsap WWTP Liquid Hauled Waste Study (Murraysmith, 2022)
- CKTP Hauled Waste Upgrades Basis of Design Report, without Appendices (HDR, 2023)
- CKTP Hauled Waste Upgrades Basis of Design Report, with Appendices (HDR, 2023)
- Preliminary Project Schedule
- Geotechnical Data Report
- Geotechnical Data Report Addendum
- Phase I Environmental Site Assessment